Browse Items (277 total)

  • Collection: WSU Buildings

http://content.wsulibs.wsu.edu/buildings/image/179.jpg
The deconstruction of Ferry Hall.

http://content.wsulibs.wsu.edu/buildings/image/21.jpg
An interior view of a dormitory living room in Ferry Hall, WSU Building #8. Three men wearing matching dark sweaters labeled 1907 sit on a couch with arms around each other's shoulders. The walls are decorated with pictures and college banners.…

http://content.wsulibs.wsu.edu/buildings/image/40.jpg
An interior view of a dormitory room in Ferry Hall, WSU Building #8; two male students in cadet uniform sit across from each other studying at a small wooden table covered with a table cloth. An exposed light-bulb hangs from the ceiling; a curtain…

http://content.wsulibs.wsu.edu/buildings/image/19.jpg
An interior view of a dormitory room in Ferry Hall, WSU Building #8. A male student wearing a striped turtleneck sweater is seated before his desk reading. A tennis racket hangs from the ceiling; to the left pictures are visible hanging on a bulletin…

http://content.wsulibs.wsu.edu/buildings/image/20.jpg
An interior view of a dormitory room in Ferry Hall, WSU Building #8. Two male students are seated on a bed, with a bag inscribed W.A.C. between them, placed in the corner of the dorm room. Chairs and a truck are present in the foreground, numerous…

http://content.wsulibs.wsu.edu/buildings/image/172.jpg
The interior of the WSU Field House.

http://content.wsulibs.wsu.edu/buildings/image/167.jpg
The interior of the WSU field house.

http://content.wsulibs.wsu.edu/buildings/image/169.jpg
The interior of the WSU Field House.

http://content.wsulibs.wsu.edu/buildings/image/96.jpg
A view of the south-west facade of the Field House, WSU building #9. The structure is nearly complete, though the bridge leading to the front entrance is unfinished. The Fieldhouse was built in 1929 at a cost of $200,000 paid for by the…

http://content.wsulibs.wsu.edu/buildings/image/98.jpg
A view of the south-west facade of the Fieldhouse, WSU building #9, during construction. The foundation and steel framework are in place. Two lifting towers are present near the front and rear of the gym. Construction workings are visible working on…

http://content.wsulibs.wsu.edu/buildings/image/99.jpg
A view looking north during the construction of the Field House, WSU building #9. The steel framework for the ceiling is partially complete. In the foreground, steel beams lie in piles beside a crane. The Fieldhouse was built in 1929 at a cost of…

http://content.wsulibs.wsu.edu/buildings/image/100.jpg
An interior view of the nearly complete Fieldhouse, WSU building #9. Piles of construction debris are visible. Light steams in from the window illuminating the unfinished dirt floor. The Fieldhouse was built in 1929 at a cost of $200,000 paid…

http://content.wsulibs.wsu.edu/buildings/image/97.jpg
A view looking south during the initial construction of the Field House, WSU building #9. Metal rods lie on exposed earth. Wooden frames outline the future extent of the gym. The Fieldhouse was built in 1929 at a cost of $200,000 paid for by the…

http://content.wsulibs.wsu.edu/buildings/image/218.jpg
The Fine Arts Building under construction.

http://content.wsulibs.wsu.edu/buildings/image/222.jpg
The Fine Arts Building under construction.

http://content.wsulibs.wsu.edu/buildings/image/173.jpg
WSU fire house and fire trucks.

http://content.wsulibs.wsu.edu/buildings/image/275.JPG
A one-story, temporary building of frame construction. Heated by steam. Overall dimensions are 25 x 150 feet and floor area totals 3,750 square feet.Completion Date: January 1948Cost: $2,041Source of funds: State of WashingtonRemarks: Cost included…

http://content.wsulibs.wsu.edu/buildings/image/153.jpg
The construction of the French Ad. Building.

http://content.wsulibs.wsu.edu/buildings/image/150.jpg
The interior stairs of French Ad.

http://content.wsulibs.wsu.edu/buildings/image/152.jpg
The interior stairs of the French Ad. Building.
Output Formats

atom, dcmes-xml, json, omeka-json, omeka-xml, rss2